What are the minimum system requirements for photovoltaic solar systems to qualify for The Solar Partners Incentive Program?
• The PV system must have all new components. • It must be a complete solar system, which includes solar panels, inverter, and other related equipment to provide AC electricity to a customer site. • If grid tied, the system must use UL-rated components and meet all of APS interconnection requirements. • The customer must provide a separate meter for the solar system and it must be placed adjacent to the existing APS meter and marked “Photovoltaic System Dedicated kWh Meter”. • Off grid systems are limited to a maximum system size of 5 kW.