What are the main steps in developing a wind farm?
Pacific Hydro only develops wind farms which are appropriately-sited, well-designed and locally supported. A typical wind farm takes around three to five years to develop from the installation of the wind monitoring mast through to first electricity generation. The main steps in development are shown below.