What are the locations of the future paths per the Master Plan?
We are currently drafting a non-motorized plan as part of the 2010 Pittsfield Plan. The intent is to create a pathway network that will connect residents to jobs, shopping, and recreational opportunities (like the Township parks). Phase 2 of the Lohr Textile Greenway is planned to connect to Marshview Meadows Park east of State Road on Textile Road.
Related Questions
- Which other locations/regions do the promoters plan to include in the future? If I am not interested in the Palani Hills project, in the future would I be able to join projects in other regions?
- How is New Jersey’s energy future altered through this Energy Master Plan?
- Can paths be added or taken away from the plan in the future?