Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

What are the load cases and design loads for these girder-restrained hinges.?

cases design hinges load loads
0
Posted

What are the load cases and design loads for these girder-restrained hinges.?

0

The hinges were designed for all group loadings, including seismic, in accordance with the Caltrans Bridge Design Specifications and the Project Specific Design Criteria. 140. Page 207 of the Specail Provisions. Where are items (B)2 and (B)3. The number “4” should be “2”, this is a typographical error. There is nothing missing from the section. 141. Are the temporary and permanent counterweights required for strength and serviceability of the completed structure, or are they required for construction? They are required for both. 142. The CRIP specs appear to address the sharing cost savings only (Part A). How will Caltrans handle CRIPs that save time but not money (Part B)? Please see Addendum #6. 143. Do the construction sequence and camber tables shown on the plans assume deck grinding or a polyester concrete overlay? The camber tables and construction sequence shown on the plans assume that the added thickness of the deck to account for grinding is in place. 144. What is the require

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123