2. What will the new Pool look like? The new pool will have a 25 metre main tank, 20 metre warm lap pool, leisure pool, hot tub, dry sauna, steam room and weight/fitness room with exercise facilities. The City has hired the firm of Hughes Condon Marler Architects, a highly respected Vancouver firm to design the building. 3. Will the new pool and existing rink operate as one complex or separate facilities? The construction of a new pool is to be the built as a separate facility with the ability to accommodate future renovations/development. 4. What are the plans for replacing the parking that is lost by building the pool in the parking lot? A net addition of 30 new parking spaces will be created between the Library and the existing parking lot. 5. What will become of the existing Chimo Pool building once the new facility is completed? The existing pool will be de-commissioned upon completion of the new facility on the east side of Poirier. Staff will be consulting with the community to