What are the Ground Rules for Establishing a Block Clearance WRT Software?
22.)For Multiple Flights Between DT and Fleet Issue: There shall be NO new requirements (ECP’s) authorized. There shall be NO changes unless the system doesn’t meet spec (STR’s/PTR’s/etc.) If the data, algorithm, or software change impacts airworthiness, a new clearance is required. At a minimum flight control, fire subsystem control (including buoys, chaff, flares, etc.), propulsion control, critical displays, and navigation should not be impacted BACK TO TOP…