Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

What are the FEMA requirements for removing a structure from the Special Flood Hazard Area (SFHA)?

0
Posted

What are the FEMA requirements for removing a structure from the Special Flood Hazard Area (SFHA)?

0

To be removed from the SFHA shown on the Flood Insurance Rate Map (FIRM), a structure must be on land that is not subject to flooding by the base (1-percent-annual-chance) flood. If a structure is located on natural ground that is higher than the Base (1-percent-annual-chance) Flood Elevation (BFE) shown on the FIRM, then a Letter of Map Amendment (LOMA) should be requested. In support of the request, a surveyor must determine the elevation of the lowest ground next to the structure. If the ground is higher than the BFE, then FEMA will issue a LOMA to remove the structure from the SFHA. Information on the data submittal requirements for a LOMA is provided in the MT-EZ and MT-1 application forms packages. If the structure was built on fill that was placed after the FIRM was prepared, a Letter of Map Revision Based on Fill (LOMR-F) should be requested. If the filled ground is higher than the BFE, then FEMA may issue a LOMR-F to remove the structure from the SFHA. Information on the data

0

To be removed from the SFHA shown on the Flood Insurance Rate Map (FIRM), a structure must be on land that is not subject to flooding by the base (1‑percent‑annual‑chance) flood. If a structure is located on natural ground that is higher than the Base (1‑percent‑annual‑chance) Flood Elevation (BFE) shown on the FIRM, then a Letter of Map Amendment (LOMA) should be requested. In support of the request, a surveyor must determine the elevation of the lowest ground next to the structure. If the ground is higher than the BFE, then FEMA will issue a LOMA to remove the structure from the SFHA. Information on the data submittal requirements for a LOMA is provided in the MT-EZ and MT-1 application forms packages. If the structure was built on fill that was placed after the FIRM was prepared, a Letter of Map Revision Based on Fill (LOMR-F) should be requested. If the filled ground is higher than the BFE, then FEMA may issue a LOMR-F to remove the structure from the SFHA. Information on the data

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123