What are the EVR requirements, and when do they go into effect?
The EVR requirements are summarized in Advisory 336. The EVR Implementation Timeline that lists effective dates and operative dates of each requirement can be downloaded from the ARB Vapor Recovery Web Site at http://www.arb.ca.gov/vapor/vapor.htm. This Timeline is applicable only to facilities with underground storage tanks. 2.