What are the criteria used for the review of submittals?
• The following criteria are used for the review of submittals: Planning/Regulatory Compliance Documentation Submittals • MAG 208 Certification Documentation – Reviewed to verify compliance with all MAG planning and certification process requirements. This submittal is only required for wastewater treatment plant projects, where a MAG 208 certification process is required (i.e. for new wastewater treatment plants or existing wastewater treatment plants whose service area is being modified). • Planning Documentation (Master Plan Report, Capacity Study, etc.) – Reviewed as required to assure that all relevant planning issues are addressed. • Regulatory Compliance Documentation – Reviewed as specified by the regulations or as stipulated by a compliance order, settlement agreement or other legal instrument. Design Documentation Submittals • Engineering Design Report, Calculations and Design Data – Reviewed to validate the design basis, verify regulatory compliance, assess system and operat