What are the Clients obligations if the project IS notifiable?
In addition to the duties outlined above, the client must; Appoint a CDM coordinator, as soon as practicable after initial design work or other preparation for construction work has begun. Inlane are able to act as CDM coordinator and it is important for the client to realise that this appointment should be made as early as possible in the design process, to enable the CDM coordinator to comply with his duties under the Regulations. Appoint a principal contractor, as soon as is practicable after the client knows as much about the project as to be able to select a suitable person. Inlane can assist with the appointment of a principal contractor and indeed, when involved with placing of the contracts, can make sure that the person is suitable, as part of the contractor procurement process. Not allow construction work to commence until the principal contractor has prepared a compliant construction phase plan. Inlane can advise on the compliance of the principal contractor’s construction p
Related Questions
- Can an accredited verification body provide technical assistance to a client on one project and be the verification body on another non-related project with the same client?
- If accessing the Project Server 2007 server via the Project Web Access Client, do they need additional software if accessing locally, ie. over the local LAN?
- What are the Clients obligations if the project IS NOT notifiable?