What are the building restrictions in Cherokee Village I should know about?
You can take as long as you want to start building on your land. Covenants and Restrictions called “Bills of Assurance” vary by Addition but are all similar. Here is a typical summary: • FHA “Minimum Property Standards for Single Living Units” is the guideline. • Single family residential. • No offensive odors, noises, etc. • Interiors to be finished within 12 months of start. • Electrical and plumbing to meet state standards. • No temporary structures such as trailers, tents, shacks, barns without approval. • Setbacks: 25 ft. front and back, 5 ft. sides. • Maximum 2 stories, minimum 1,000 square feet. • Public utility easements. • What is a percolation test and how much does it cost? A ‘perc test’, as it is commonly called, is a water drainage test that is required by the health department before a permit is issued to build a private septic system on your property. The cost of a perc test and survey is about $350. Translate this Webpage to French, Italian, Portuguese, Spanish, or Germ