What are the basic steps to installing sod?
A. Prepare the soil as if you were seeding; measure the area to be sodded to calculate the quantity you'll need to order; lay the first piece along a straight line such as a driveway or sidewalk; install all additional pieces so the seams create a brick-like pattern; apply at least one inch of water on the new sod, beginning within 30 minutes of laying down the first piece; keep the base soil moist with daily (or more frequent) watering for the next two weeks.