What are the basic steps in constructing base course ?
– Shoulder stakes are surveyed; – Any required repairs are done; – Grader scarifies existing surface; – Scarified surface is compacted; – Gravel is hauled and placed on site; – Gravel is windrowed – Gravel is bladed to proper shape; – Base is watered; – Base is thoroughly compacted; – Prime coat is applied and cured – Road is ready for surfacing.