WHAT ARE THE APPLICATION CONSTRAINTS OF MICRO FUSION?
1. Cold starting a Micro Fusion Unit requires a 25 kW external source of electricity and takes about 20 minutes. 2.The catalyst used in Micro Fusion is expensive. Measures should be taken to prevent its loss or theft. 3. The relatively low power density of Micro Fusion equipment and the weight and size of the equipment and the required shielding preclude almost all mobile applications. 4. The weight of the required shielding causes Micro Fusion Units to be installed below grade. This requirement can complicate heating piping connections to existing tall buildings that have roof top central heating systems. 5. Micro Fusion Units are intended to be operated close to their rated thermal power level.