What are “Resubmitted Lots or Batches”?
Lots or batches found unacceptable shall be resubmitted for re-inspection only after all units are re-examined or retested and all defective units are removed or defects corrected. The responsible authority shall determine whether normal or tightened inspection shall be used and whether re-inspection shall include all types or classes of defects or only the particular types or classes of defects which caused initial rejection.