What are requirements regarding pot holing?
Each utility line must be pot holed and exposed and identified as the correct utility before crossing over, under or paralleling within 18 inches. The pothole needs to be where the excavation is going to cross the utility. If utility lines are not found on or within 18 inches of either side of the marks while exposing before excavation, Springs Utilities must be notified at 719-448-4800 to help determine the correct location.