What are requirements of the time and temperature when mixing epoxy asphalt concrete?
The epoxy resin component is maintained at 80-85°C prior to mixing. The asphalt/curing agent component is maintained at 150-155°C prior to mixing. The aggregate temperature is controlled to be about 113-124°C. The mixed batch as it leaves the pug-mill (asphalt plant mixing chamber) is controlled to be between 110 and 121° C.