What are lead times for fabrication and delivery?
Matot can provide shop drawings for approval within a week of placement of an order. Matot has no control of the time taken to approve the shop drawings. When clear approved shop drawings are returned to Matot, equipment can be scheduled for production and shipment. Typical lead times are 3-5 weeks for standard equipment, 5-7 weeks for complex equipment [high rise, high speed, power doors].