What are Crack Trains?
Crack Trains were introduced on ER for similar reasons as for Link Trains on CR. A crack train is run on a link system (scheduled engine and staff). However, as ER is a dense and relatively compact railway zone where extended runs are difficult (200km might constitute an inter-divisional movement), the idea was to run these trains with one set of crew for the outward and homeward journeys, by having a very quick turn-around (1 hour or less) at the out-station. The outward and homeward journeys together constituted just one cycle of duty for the crew. The turn-around was done if possible in the outstation yard itself without visiting the outstation shed. A goods rake for the return journey was kept ready and waiting in the other portion of the yard so that the engine could be coupled to it and start on its return journey as soon as possible. Because the same crew comes back on the homeward journey, the entire trip has to be fairly short, within about 10 hours to comply with regulations