What are building costs in Hakuba?
The main driver of the cost of building is the price of materials used. As the cost of raw materials varies depending on market conditions the prices below should be taken as a broad indication only. More detailed and accurate quotes are available at the time of building. The prices below do not include fittings, white goods, furnishings and finishes. Timber Construction 735,000/tsubo (222,700/M2) Steel Construction 830,000/tsubo (251,500/M2) Concrete construction 910,000/tsubo (273,200/M2) In addition to these costs, water connection, property registration and other fees apply.