What are BAMCOs standard lead times?
Lead times vary based on project size and complexity. On smaller projects, shop drawings run approximately 6-8 weeks. Upon approved drawings, fabrication times run approximately 2-4 weeks. Quick ship programs are available on certain projects and can be requested by contacting sales@bamcoinc.org. A: Post finished products are fabricated and then individually spray finished with either air or heat cured paints. Finish warranties are generally 5 to 10 years. Coil coating is a process where metal coils are run through a continuous application process called “reverse rolling”. Once coated, these coils provide the highest level of color consistency, even coil to coil, with standard 20 year finish warranties.