What are Angel Labs achievements over the past 4 years with about $4 million spent?
• Most investment was in R&D, prototype construction and plant and equipment. I. The first prototype of the MYT engine was built from scratch to prove that the engine technology is testable II. Since not a single part was farmed out, every part was built using Angel Labs purchased CNC machines with CAM programs to perform in production environment. III. Test Equipment including a Dynamometer by Superflow was purchased and test cell was built. To preserve the few engines, the company selected air motoring test (less invasive) that resulted in 814 ft. lbs. of torque from 150 psi of compressed air at 900 rpm. IV. We also performed R&D for a passenger car that employs a different air motoring technique for more efficient light transport.