What application should a high efficiency combined heat and power project complete?
It depends upon the fuel source. If the fuel source is a wood or other biomass fuel source, fill out the Tier General Application form (use the appropriate form for the facility: Tier 1, 2 or 3) and the Appendix 1 – Biomass, Wind, Hydro & Geothermal form. If the fuel source is natural gas, fill out the Conservation application form. All of these forms can be found at the ODOE website: http://www.oregon.gov/ENERGY/CONS/BUS/BETC.shtml. 2. Question: If the Oregon Department of Energy rejected an application due to changes in the Business Energy Tax Credit rules, and construction has begun or the facility is nearly operational, is the project still eligible for consideration? Answer: Yes. If your application was rejected by the Oregon Department of Energy in May 2010 because of the changes from House Bill 3680 and the implementation of the tiered priority system, you are still eligible for consideration in the competitive tier process. You must submit a new application meeting all the requ
Related Questions
- My project involves a propane-fired combined heat and power system that is offsetting the space heating load for an oil boiler. How should I calculate the MMBTU value for the Application?
- Do I have to complete the Research Project Application Tool (Research Application Cover Sheet and Costing/Pricing Sheet) for applications to the ARC or NHMRC?
- Can the degree of efficiency of the combined heat and power plant (CHP) be determined by a gas quality and volume measurement?