What analyses will be done to ensure that the power uprates are safe?
The Nuclear Regulatory Commission provides specific guidance on the content of an extended power uprate license amendment. The detailed engineering analyses required for the uprate effort and the NRC license amendment applications will examine all essential safety and technical aspects of the uprate project. FPL’s analyses will confirm that current safety systems are adequate at the higher power level or will identify modifications needed to ensure the safety of the plant and the public.