What alternatives are analyzed in the PEIS?
Two alternatives are analyzed in detail. The No Action Alternative would designate no federal land as a Section 368 corridor. The Proposed Action would designate energy corridors on federal lands for oil, gas, and hydrogen pipelines and electricity transmission and distribution facilities in the 11 contiguous western states. Designated corridors would be the preferred locations on federally managed lands for future energy transport projects. This would involve designating approximately 6,112 miles of Section 368 corridors on federal lands in the West in 131 corridor segments.