What access points (driveways) will be approved for parcels on the south side of the new bridge?
This parcel will have no accesses approved from US 60 due to the following: It was purchased by ADOT as Access Control Right of Way – meaning no access ispermitted. Much of the parcel’s frontage is taken up by new guardrail for the bridge and a new sidewalk under the bridge to access the pedestrian bridge starts across this parcel.