Upgrading to 11g Release Grid Infrastructure?
Oracle 11g Release 2 Grid Infrastructure has been dramatically redesigned compare to 10g and 11gR1 Clusterware. Coming with impressive set of new features, Grid Infrastructure also uses much more memory. While RAM is rather inexpensive these days, it does pose an inconvenience in some scenarios. Particularly, for sand-box type installations that I use all the time for my own tests and demonstrations. For production upgrades, you need to be aware of and plan for increased memory usage. I’ve been able to easily run a 2 node 10g RAC cluster on my MacBook with 4 GB of RAM allocating less than 1 GB of RAM to each virtual machine. That was even enough for a mini database instance with a very small memory footprint. Oracle 11g Release 1 was pretty much the same except maybe the database instance itself required a bit more memory but one node could still fit within 1 GB of RAM.
Related Questions
- After upgrading to a new release of OS/390, I am seeing ACF99913 and ACF04056 violation messages that did not occur in the previous release. What changed and how do I correct this?
- Whats involved in upgrading an iDCS 500 from release 1 to release 2 software?
- Upgrading to 11g Release Grid Infrastructure?