There are multiple departments/units in my building. What is the level of granularity at which organization(s) can choose whether to opt-in or not?
We’re looking at adding Wall-Plate on a whole-building level. If there is a difference of opinion between occupants, eg. in a multi-department building, then their higher administration, ie. the college, will become involved to help determine the decision. Cross-college buildings will be handled on a case-by-case basis where needed. In the past, some spaces were given Wall-Plate service at less than the building level, and a great deal of confusion and interference resulted from the lack of coordination.
Related Questions
- If a provider enters the HCPCS Level I, II or III code, units and/or NDC correctly, but does not enter the unit of measurement correctly, will that line item be denied?
- There are multiple departments/units in my building. What is the level of granularity at which organization(s) can choose whether to opt-in or not?
- How do I report permits for a multi-family building when individual units are permitted separately?