The insurance furnished under the OCIP covers the Water Authority, the Contractor and subcontractors (with some exceptions). What are the exceptions?
Exceptions may include subcontractors performing work for less than a day, vendors, and sub-contractors providing professional or technical services who are not on-site. 2008-06-19 CALOSHA has classified the tunnel and shafts as “Potentially Gassy.” Section 02311, Part 2.01, Paragraph A, Item 1 states that equipment should comply with CALOSHA requirements for a “Gassy” tunnel. Is that correct? Does it apply only to the TBM or roadheader or drills or to haulage equipment as well? See Addendum 6. 2008-06-19 We can’t find Drawing S-16. Please advise. There is no Drawing S-16. 2008-06-19 It is not clear what the Contractor has to supply and install in the field in regards with the 60″ Special shown on Detail 3 of Drawing S-8. Can an as-built drawing for the 60″ Steel Special and a separate final product (field manufactured) drawing be provided? No. The spool piece was shown during the prebid site visits on 5/8/08 and 6/4/08.
Related Questions
- The insurance furnished under the OCIP covers the Water Authority, the Contractor and subcontractors (with some exceptions). What are the exceptions?
- Can the contractor provide proof of current Worker Compensation Insurance and that the Worker Comp covers all of the job?
- Does the contractor have workmen’s compensation insurance on all his workers and subcontractors?