Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

The insurance furnished under the OCIP covers the Water Authority, the Contractor and subcontractors (with some exceptions). What are the exceptions?

0
Posted

The insurance furnished under the OCIP covers the Water Authority, the Contractor and subcontractors (with some exceptions). What are the exceptions?

0

Exceptions may include subcontractors performing work for less than a day, vendors, and sub-contractors providing professional or technical services who are not on-site. 2008-06-19 CALOSHA has classified the tunnel and shafts as “Potentially Gassy.” Section 02311, Part 2.01, Paragraph A, Item 1 states that equipment should comply with CALOSHA requirements for a “Gassy” tunnel. Is that correct? Does it apply only to the TBM or roadheader or drills or to haulage equipment as well? See Addendum 6. 2008-06-19 We can’t find Drawing S-16. Please advise. There is no Drawing S-16. 2008-06-19 It is not clear what the Contractor has to supply and install in the field in regards with the 60″ Special shown on Detail 3 of Drawing S-8. Can an as-built drawing for the 60″ Steel Special and a separate final product (field manufactured) drawing be provided? No. The spool piece was shown during the prebid site visits on 5/8/08 and 6/4/08.

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123