Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

The BMP manual includes minimum design permeability rates for groundwater recharge and infiltration BMPs. Is there a maximum permeability rate?

0
Posted

The BMP manual includes minimum design permeability rates for groundwater recharge and infiltration BMPs. Is there a maximum permeability rate?

0

All field permeability tests must utilize half the tested rate for the design of infiltration facilities to provide a safety factor. Furthermore, for any field tested rate of 20 inches per hour or greater, the maximum allowable design soil permeability rate shall be 10 inches per hour in order to ensure basin drawdown within 72 hours.

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123