Task 3: Proof-of-Concept Demonstration Q: What work will be accomplished during Task 3, Proof of Concept (POC)?
• POC Deployment Plan, • Call Taker Human Machine Interface (HMI) Design, • Data Analysis Plan/Data Acquisition System Design, • Proof-of-Concept Test Plan , • POC Demonstration Report/Test Results, and • Final POC System Design. Q: What are the objectives of the Proof-of-Concept? A: The objective of the Proof-of-Concept is to test specific requirements from the NG9-1-1 Detailed System Requirements Document. Specific requirements were selected from a prioritized list developed by the NG9-1-1 team with input from a variety of 9-1-1 stakeholders. The specific objectives of the POC include: • Developing a working NG9-1-1 model that can receive text, images, and video (in addition to voice) from several different kinds of access networks and communications devices (e.g. PDAs, computers, auto telematics), • Demonstrate 9-1-1 call transfer, backup and distance access among geographically dispersed PSAPs using NG9-1-1, IP-based routing capability, and • Demonstrate use of open platforms and n