Stamped shop drawings are required for the project. How much time is required to get a full engineering package with a state stamp?
• Lead times for engineering consultants typically range from 2-6 weeks. In addition, after the engineering consultant receives that contract documents (architectural drawings, structural drawings and owner’s specification), a proposal or contract (which includes cost and schedule) is prepared by the engineer. The proposal also requires a signature from the customer in order to formally begin the work, this can take a few days. Using 4 weeks as an average backlog, it is best for the customer to allow for 5 weeks of preparation for a final stamped engineering package. Contact ClarkWestern for obtaining stamped engineering packages.
Related Questions
- What are the engineering loads for the VersaTube system? Who do I contact for a stamped engineering calculations and/or drawing package for permitting purposes?
- Stamped shop drawings are required for the project. How much time is required to get a full engineering package with a state stamp?
- What is the time frame for the Free State Project?