Since my development is still in the early stages of construction, access can be a problem. What type of access does YBC need?
In order to properly build the bridge, YBC needs adequate access to each work site for construction materials and equipment. Specifically, in three areas: 1. Access to a staging area, where our delivery trucks can drop off the materials and lumber and we can then transport the materials to the bridge location. YBC usually has lumber delivered in stages, especially for projects with large or multiple bridges. Even though, the staging area should be at least 100′ x 100′. 2. Access to carry the materials and equipment to the bridge site, which may include application of gravel to solidify the road surface and permit entry during inclement weather. This access should be maintained throughout the construction process, especially during inclement weather. 3. Access to build the bridge, which may include removal of vegetation and trees, road shaping, or scraping. If we are constructing a pile-supported bridge, we require access to only one side of the bridge site; however, if we are building
Related Questions
- What can I do when I see a problem in the roadway in a residential subdivision or commercial development that is under construction (i.e., safety issues, drainage problems, potholes, etc)?
- Apart from construction stages analysis, what type of post-construction analysis ADAPT-ABI can perform?
- How many Stages are there in the development of the construction of the replica car?