Should the level of difficulty that a contractor experiences during construction be used as an indicator of the quality of design?
Related Questions
- Can specific sections and/or parts from both the old code and the new code be used in the design and construction of a building or structure?
- Ive already used Word, Excel, or Publisher to design my layout. How can I still achieve a high quality reproduction?
- How can existing technologies be used in the design of effective teaching and learning experiences?