Section 01010, Part 1.07, Paragraph H mentions the inlet and outlet vaults and butterfly valves are to be installed by the FRS II contractor. Can a drawing or detail be provided?
See Addendum 4. These reference drawings are provided as Appendix I. 2008-06-19 There are conflicting provisions regarding the contract documents and which contract documents would serve as a baseline in the event a differing site condition is encountered. Contractor requests that the GBR should be incorporated into the subcontract as a contract document under General Conditions Section 1.2(1) and that a clear order of precedence among the contract documents be established. The GBR and GDR are referenced in Instructions to Bidders, Section 1, Requirements and Conditions. The GBR and GDR are included in Appendix G of the Contract Documents and are covered in the precedence of documents listed in General Conditions and Standard Specifications, 2005 Edition, General Conditions, Part 1.1, Paragraph (g), Item 9.
Related Questions
- Section 01010, Part 1.07, Paragraph H mentions the inlet and outlet vaults and butterfly valves are to be installed by the FRS II contractor. Can a drawing or detail be provided?
- Why do you offer the MSP menu code with check valves installed in the outlet when the MSP base section has a built-in check valve?
- How do you weld the ductwork to the PCU with the gasketing around the inlet/outlet?