Important Notice: Our web hosting provider recently started charging us for additional visits, which was unexpected. In response, we're seeking donations. Depending on the situation, we may explore different monetization options for our Community and Expert Contributors. It's crucial to provide more returns for their expertise and offer more Expert Validated Answers or AI Validated Answers. Learn more about our hosting issue here.

Potential Lead time to have a unit delivered once it is ordered?

0
10 Posted

Potential Lead time to have a unit delivered once it is ordered?

0
10

Is there machining on the cone for the new cone nozzles or are the original locations used? The original cone locations are used, OEM manifold is used, high pressure flex line is installed and the manifold flanges are upgraded from 150lb to 600lb. Drilling and machining on the bellmouth only. Regarding the 3% bias on the pilot, is the gas reduced from the other 3 stages, in even amounts? Evenly pulled from A&B Total time for installation when unit arrives onsite? Nozzle installation is 2 x 12 hr shifts with 1 mechanic and 1 machinist. Skid/interconnect piping/ valves/ bellmouth manifold and electrical 2 mechanics, 2 welders/pipefitters, 2 I&C 3 x 12 hr shifts- Controls 1 engineer 1 12 hr shift Do you have an option for online soap washes? No GTE does not recommend soap for online washes. GTE installs a conductivity meter to ensure the water is below 10ppm demin/deionized water for maximum cleaning effectiveness (the deionized water has a magnetic attraction to pull dirty from the blade

Related Questions

What is your question?

*Sadly, we had to bring back ads too. Hopefully more targeted.

Experts123