Our customers require us to show SPC charts to demonstrate process control even though our small production runs don allow for extensive sampling. Can your software accommodate my needs?
Related Questions
- If my long-term stability chart for the measurement process shows control but a very small range and/or runs on the average chart, is this unacceptable?
- To correctly perform SPC on our multicavity molds would require an enormous number of charts. What options do I have with NWA Quality Analyst?
- Can control charts detect small process shifts?