My residential area has been approved for a gas main extension. When will the line be installed?
This is determined by the engineering department and will be scheduled as soon as possible. Do not remove your present system until you receive a letter from the secretary informing you that gas is on the line and ready for operation. Even short gas main extensions take significantly more engineering and permitting than service lines and therefore, several months generally are required for this process before a main can be constructed.