Must a nonproject EIS on a GMA plan or subarea plan follow a specific format?
The only requirements are that the document begin with a fact sheet and contain an environmental summary [WAC 197-11-235(4) and (5)]. An agency may choose whatever format they feel would best present the alternatives and environmental analysis [WAC 197-11-430(2) and 442]. Separate sections on affected environment, significant impacts, and mitigation measures are not required in integrated documents as long as this information is summarized and supported in the record [WAC 197-11-235(2)(b)]. The rules for integrated documents stress that format should be dictated by attention to the quality, scope, and level of detail of the information and analysis [WAC 197-11-235(1)].Q: What is an “alternative” when preparing an EIS for a comprehensive plan? How is the no action alternative defined? A: A range of alternatives should be evaluated, exploring the different land use options, including different urban growth area boundaries, characteristics and densities of development, etc.
The only requirements are that the document begin with a fact sheet and contain an environmental summary [WAC 197-11-235(4) and (5)]. An agency may choose whatever format they feel would best present the alternatives and environmental analysis [WAC 197-11-430(2) and 442]. Separate sections on affected environment, significant impacts, and mitigation measures are not required in integrated documents as long as this information is summarized and supported in the record [WAC 197-11-235(2)(b)]. The rules for integrated documents stress that format should be dictated by attention to the quality, scope, and level of detail of the information and analysis [WAC 197-11-235(1)].