Leak Surveys: Are leak surveys conducted in accordance with 49 CFR § 192.706 sufficient to assess carrier pipe integrity in a shorted casing?
No. Leakage surveys are not capable of identifying anomalies or defects in pipe that must be repaired as required by the Integrity Management Rule, 49 CFR Part 192, Subpart O. Under the Integrity Management Rule, operators cannot leave shorted, contacted or coupled casings (either metallic or electrolytic) in their pipelines or segments without mitigating the situation. Such a condition (shorts, contacts or couples) is considered detrimental to the long-term integrity of the covered segment. • FAQ-262. Minimum Number of Direct Examinations: An operator has multiple casing regions in a pipeline segment and each region has multiple casings. A variety of immediate, scheduled, and monitored indications were identified. How many direct examinations must be made in the ECDA process? [03/01/2010]Answer: The number of direct examinations needed in each casing region is determined by the number of immediate, scheduled and monitored indications in accordance with NACE RP 0502-2002, § 5.10 and 49
Related Questions
- Leak Surveys: Are leak surveys conducted in accordance with 49 CFR § 192.706 sufficient to assess carrier pipe integrity in a shorted casing?
- Must an establishment document that it has re-evaluated and maintained its SSOP in accordance with 9 CFR 416.14?
- Can the surveys be conducted in alternative locations?