Key performance indicators and reports come from our EAM system, will PRO-M need to interact with this process?
PRO-M does not produce or directly use performance indicators; PRO-M expects a PM program owner to use exceedance of facility-specific performance criteria monitored within the EAM system or elsewhere (e.g. 2 failures in one year on this motor are OK, but 3 is too many), to raise a red flag about possible need for PM changes. PRO-M is the tool he will use to find out what to do about such an exceedance, or lower numbers of failures that do not actually exceed the criterion. PRO-M can assist the user in determining if an exceeded performance indicator is set at a proper action level – using its Performance Criteria calculator.