Ive heard that new installation requires that the new wood arrive at my house a few days before the actual installation takes place. How many days should I allow?
A. The new wood needs to acclimate to the humidity levels in the rooms in which it is to be installed. The acclimation process generally takes 7-14 days. At day seven, we will use a moisture meter, to check the moisture in the wood to determine if the moisture level in the new wood is similar to that of the sub-floor.