Isn’t this level of change going to make our city centre into a 15-year building site?
Some changes will be small and can be done quickly with minimal disruption. The bigger sites are going to take longer to build but it is unlikely that all would be underway at the same time. At any moment over the next 15 years you could walk around and find something happening at every moment, but there will also be areas left undisturbed for almost all of the next 15 years.