Isn $103 million a little expensive?
For 5.6 miles of track — there would be one 2.8-mile set running in each direction — the cost of getting a streetcar line up and running comes out to $290.29 per inch. The cost includes the trains, a maintenance facility and shelters. In Cincinnati, a proposed 4-mile loop has been estimated at $102 million.