Is WDC system “turn on” available?
WDC offers “start up” for every UPS and Power Regulator system. The “start up” entails an onsite trained engineer to ensure proper installation and operation of the WDC unit. Operation will be checked during normal and maximum operating conditions. “Start up” should be scheduled after the WDC is installed and powering the load. The WDC unit should be left in the bypass mode and activated into the “Auto” mode by the WDC service personnel.