Is there any reference that differentiates between temporary shotcrete work and permanent shotcrete work, as far as inspection/testing requirements?
Temporary lagging of shotcrete must meet some standard as it is the shoring holding back the earth. If reinforcing is used in the design of the temporary shoring it must be fully encapsulated to provide the design strength of the lagging as specified in the design. A temporary structure may have a low safety factor but the strength of the rebar and shotcrete must meet the design specifications. Many times it is more important to do good shotcrete for the temporary shoring just because it has a lower factor of safety and therefore less allowance for poor construction practices. (back to top) Question 21: I am looking for design information for shotcreting a steel sheet pile wall to create a composite structure for a lift station wet well. I can design the sheet piling, which would be driven into the ground in a plan circle of 12 feet diameter, followed by excavation. I need to know the practicality of then applying a layer of shotcrete, primarily as a means of sealing the joints of the