Is there an easier way to coat the trim work in my application area and can the application area be coated in sections at different times?
An easy way to coat the trim work is to mix a smaller batch of the epoxy material at a 2 to 1 ratio (2 parts epoxy resin to 1 part hardener) and then mixing the remaining amount of product to coat the entire surface area. The coating may be applied in sections at different times by simply coating up to an existing expansion joint or by taping off the area and immediately removing the tape after applying the coating. There will be no variation in color if the product is applied at different times.