Is there a level of programme or project risk below which it does not have to be subject to an OGC Gateway Review?
Departments should use the RPA to determine the risk level of their programmes and projects and to understand the nature of the risks associated with them in a structured and systematic way. Programmes or projects classified as low risk that score in the range 20 to 30 are likely to contain significant procurements. Departments may decide on a deminimis cut off point below which an OGC Gateway Review is not needed but must do so on the basis of a full understanding of the implications and be accountable for their action.