2)Generally, the larger the system the more time it takes to install. However, it is not the unit that increases the time but it is the loop, and in some cases the ducting. So, if there is no loop then the time is about the same for any single compressor system. A dual system will obviously take more time because there are double water hook-ups. Since we build all “normally external” parts “internal” and we pre-wire and pre-fuse, we dramatically reduce the installation time in any case. There would be no extra time needed for pump wiring and on-site approvals etc. because the whole system is CSA approved as a complete unit.