Is the Waste Water Treatment Works Moving?
In the previous consultation it was suggested that the Cambridge Waste Water Treatment Works be moved from its current location on the Cambridge Northern Fringe (East), so that new housing could be built in the area. The proposals to move the Works to Fen Ditton caused many concerns, and questions were raised about the feasibility of the proposed development. A feasibility study, undertaken by Cambridgeshire Horizons working with local Councils, concluded that the redevelopment was not feasible. As a consequence the Works are not going to be moved.